New Police Headquarters – Belleville

[vc_row row_type=”row” use_row_as_full_screen_section=”no” type=”grid” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern” css_animation=””][vc_column width=”1/2″][vc_column_text]

Tender Closing: June 27, 2018 @ 1:00 p.m. (EXTENDED)

This is a public tender.

 

Project Description:

R.E. Hein Construction invites you to tender the New Belleville Police Headquarters project which consists of an interior renovation and new addition.

 

Tender Documents:

Click Here to download Tender Drawings

Click Here to download Phase 1 Demolition and Existing Building Drawings

Click Here to download the Tender Specifications

Click Here to download the Geotechnical Report

Click Here to download the Environmental Assessment

Click Here to download the Designated Substance Report

 

Click Here to download Addendum #1

Click Here to download Structural Drawings from Addendum #1

Click Here to download Addendum #2

Click Here to download Addendum #3

Click Here to download Addendum #4

Click Here to download Addendum #5

Click Here to download Addendum #6

Click Here to download Addendum #7[/vc_column_text][/vc_column][vc_column width=”1/2″][vc_column_text]

Project Division Required:

  • Section 02 41 13 – Selective Site Demolition
  • Section 02 41 16 – Structure Demolition
  • Section 03 10 00 – Concrete Forms and Accessories
  • Section 03 20 00 – Concrete Reinforcement
  • Section 03 30 00 – Structural Cast-In-Place Concrete
  • Section 03 53 00 – Concrete Toppings and Underlayments
  • Section 04 05 00 – Masonry
  • Section 05 12 10 – Structural Steel
  • Section 05 41 15 – Structural Metal Stud Framing
  • Section 05 50 00 – Metal Fabrications
  • Section 05 51 29 – Metal Stairs
  • Section 06 10 00 – Rough Carpentry
  • Section 06 20 00 – Finish Carpentry
  • Section 06 40 00 – Architectural Woodwork
  • Section 06 61 19 – Quartz Surfacing Fabrications
  • Section 07 13 52 – Modified Bituminous Sheet Waterproofing
  • Section 07 21 13 – Insulation
  • Section 07 21 29 – Sprayed Insulation
  • Section 07 42 13 – Metal Wall Panels
  • Section 07 52 00 – Modified Bituminous Membrane Roofing
  • Section 07 61 00 – Sheet Metal Roofing
  • Section 07 84 00 – Firestopping
  • Section 07 92 00 – Joint Sealers
  • Section 08 11 00 – Metal Doors and Frames
  • Section 08 11 16 – Aluminum Doors and Frames
  • Section 08 14 16 – Wood Doors
  • Section 08 33 23 – Overhead Coiling Doors
  • Section 08 33 32 – Overhead Coiling Counter Doors
  • Section 08 34 63 – Detention Doors and Frames
  • Section 08 44 13 – Glazed Aluminum Curtain Wall
  • Section 08 62 10 – Plastic Skylights
  • Section 08 71 00 – Door Hardware
  • Section 08 80 50 – Glazing
  • Section 08 87 23 – Security Film
  • Section 08 90 00 – Louvers and Vents
  • Section 09 21 16 – Gypsum Board Assemblies
  • Section 09 30 13 – Ceramic Tiling
  • Section 09 30 50 – Tile Setting
  • Section 09 51 13 – Acoustical Panel Ceilings
  • Section 09 64 53 – Resilient Wood Flooring
  • Section 09 65 16 – Resilient Sheet Flooring
  • Section 09 65 19 – Resilient Tile Flooring
  • Section 09 65 66 – Resilient Athletic Flooring
  • Section 09 68 00 – Carpeting
  • Section 09 91 13 – Exterior Painting
  • Section 09 91 23 – Interior Painting
  • Section 10 10 00 – Misc Specialties
  • Section 10 21 16 – Plastic Toilet Compartments
  • Section 10 22 13 – Wire Mesh Partitions
  • Section 10 26 00 – Wall and Corner Guards
  • Section 10 28 10 – Toilet and Bath Accessories
  • Section 10 51 13 – Metal Lockers
  • Section 11 12 00 – Parking Control Equipment
  • Section 11 13 13 – Loading Dock Bumpers
  • Section 11 12 19 – Loading Dock Levelers
  • Section 11 19 50 – Detention Equipment
  • Section 12 48 13 – Entrance Mats and Frames
  • Section 14 42 13 – Inclined Wheelchair Platform Lift
  • Division 21 – Fire Suppression
  • Division 22 – Plumbing
  • Division 23 – HVAC
  • Divisions 26 and 27 – Electrical
  • Division 31 – Earthwork
  • Division 32 – Exterior Improvements
  • Division 33 – Utilities
  • Designated Substance Report